| — | Operation and Maintenance of Ashram to Badarpur Elevated Highway Section of Delhi Agra Section of NH 44 from Km. 8.600 to Km. 16.100 in the State of Delhi for 01 year national highways authority of india•NHAI HQ•13-Aug-2026 | — | ₹9.85 Cr | — | Admitted-Finance | View |
| — | Slope protection measures and landslide restoration of hill slopes on Bogda Sada section of NH 566 in the state of Goa on EPC Mode national highways authority of india•Goa•21-Aug-2026 | — | — | — | Admitted-Fee/PreQual/Technical | View |
| — | Operation and Maintenance including Routine Maintenance and Incident Management of Four Lane of Ambala-Pehowa Balance Length Section of NH-152 From Km 3.700 to Km. 46.200 and Incident Management services (from km. 0.00 to km. 50.360) in the State of national highways authority of india•PIU Ambala•14-Jul-2026 | — | ₹6.37 Cr | — | Admitted-Finance | View |
| — | Emergent and Special Work of Dhaula Kuan section of NH-48 and Other Works along the Project Highway from Km. 11.000 to Km. 13.940 (Dhaula Kuan in Delhi to RTR Flyover) of Six Month (6month) on Item Rate basis national highways authority of india•NHAI PIU DWARKA•24-Jul-2026 | — | ₹9.45 Cr | — | Admitted-Fee/PreQual/Technical/Finance | View |
| DQ | Construction of VUP along with additional exit entry ramp at Shastri Colony Ambala Cantt at km 198.300 on NH 44 in the State of Haryana on EPC mode national highways authority of india•AMBALA•02-May-2020 | — | ₹13.52 Cr | — | Awarded: WELKIN INDIA INCORPORATE | View |
| — | Supplying and Erection (Fixing/Installation) of Pre-Fabricated Office Container of Various Sizes as per the drawing provided by the NHAI along with various necessary civil works and general electrical works at Various Locations along Eastern Peripher national highways authority of india•PIU Ghaziabad•18-Sep-2020 | — | ₹1.49 Cr | — | Admitted-Finance | View |
| — | Construction of Two laning with Paved Shoulder of Khatima bypass of Sitarganj-Tanakpur section on NH-125 from Km. 24.720 to Km. 32.975 in the State of Uttarakhand under NHDP Phase-IV on EPC mode national highways authority of india•NHAI HQ•21-Jan-2021 | — | ₹46.35 Cr | — | Accepted-Technical | View |
| L1 | Six Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Installation of Rainwater Harvesting Systems (2nd Call) national highways authority of india•Ambala•09-Apr-2021 | ₹6.52 Cr | — | — | Awarded (L1) | View |
| DQ | Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode national highways authority of india•Chandigarh•21-Jun-2021 | ₹48.66 Cr | — | — | Awarded: S S BUILDERS | View |
| DQ | 2 lane with paved shoulder of Najibabad Kotdwar section of NH 119 from Design Ch. 122.200 to 137.760 Existing Ch. 138.635 in the state of Uttar Pradesh. national highways authority of india•NHAI HQ•05-Oct-2021 | — | ₹81.44 Cr | — | Rejected-Technical | View |
| DQ | Construction of 4 lane VUP at km 39.960, flyover at km 40.320 and km 46.630 between km 39.300 to km 47.170 in Kurali-Kiratpur section of old NH-21 (new NH-205) in the State of Punjab on EPC Mode national highways authority of india•Chandigarh•07-Dec-2021 | ₹53.66 Cr | — | — | Awarded: Singla Constructions Limited | View |
| L1 | Six Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Rectification of Rain Cuts national highways authority of india•Ambala•14-Dec-2021 | ₹23.51 Cr | — | — | Awarded (L1) | View |
| L2 | Six Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Regarding providing and fixing of Additional Signages national highways authority of india•Ambala•27-Dec-2021 | ₹1.16 Cr | — | — | Awarded: Vibgyor Industries | View |
| DQ | Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode national highways authority of india•Ambala•27-Apr-2022 | ₹21.44 Cr | ₹25.91 Cr | -17.25% | Awarded: WELKIN INDIA INCORPORATE | View |
| — | Rehabilitation and Re-construction of 2- lane of Shimla- Mataur Section of NH-205 from Km 18.500 to km 18.615 at Ghandal landslide location on EPC mode in the state of Himachal Pradesh. national highways authority of india•PIU-Shimla•04-May-2022 | — | ₹20.88 Cr | — | Accepted-Technical | View |
| — | Construction LVUP on Six Lanning of Agra Etawah Bypass section of NH-2 from km 270.270 to km 270.830 and Construction of Foot Over Bridge at Km 274.055 in the state of Uttar Pradesh to be executed on EPC Mode national highways authority of india•AGRA•20-Jul-2022 | — | — | — | Accepted-Technical | View |
| L2 | Repair and Rectification of defect and deficiencies at the Risk and Cost of concessionaire of Project Highway on Ludhiana Talwandi section of old NH-95 (new NH-05) from km 92.000 to 170.000 in the State of Punjab national highways authority of india•Ludhiana•28-Jul-2022 | ₹14.55 Cr | ₹18.32 Cr | -20.56% | Awarded: NKC CONSTRUCTIONS PRIVATE LIMITED | View |
| L3 | RECTIFICATION OF MORTH IDENTIFIED BLACK SPOTS JK -02-020 (GOLE MELA) AND CONSTRUCTION OF SERVICE ROAD TO EXISTING VUP AT SINGOOR ON JAMMU UDHAMPUR SECTION OF NH-44 (KM 14.200) IN UDHAMPUR (JAMMU AND KASHMIR) national highways authority of india•Udhampur , JK•01-Aug-2022 | ₹41.41 Cr | ₹44.38 Cr | -6.68% | Admitted-Finance | View |
| L2 | Rehabilitation and Strengthening work by Overlaying of 4/6 laning of Ludhiana-Talwandi section of NH-05 from km 85.980 to 92.000 (length 6.02 km) in the State of Punjab. national highways authority of india•Ludhiana•17-Aug-2022 | ₹8.63 Cr | ₹11.59 Cr | -25.58% | Awarded: NKC CONSTRUCTIONS PRIVATE LIMITED | View |
| DQ | Overlay with BC in identified stretches and Routine Maintenance for Jodhpur Pachpadra Section of NH 25 from Km. 95.140 to 114.610 and from Km. 116.060 to 180.755 (Total length 84.165) in the State of Rajasthan. national highways authority of india•NHAI RO JAIPUR•16-Sep-2022 | — | ₹29.55 Cr | — | Rejected-Technical | View |
| DQ | Miling and BC overlay work in Shivpur Jhansi section of NH 27 national highways authority of india•Shivpuri-Jhansi•18-Oct-2022 | — | ₹30.67 Cr | — | Rejected-Technical | View |
| — | Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode national highways authority of india•NHAI HQ•04-Jul-2023 | — | ₹35.48 Cr | — | Admitted-Finance | View |
| DQ | Long Term measures to the MoRTH identified blackspot ID JK02005 at Barnoti and additional measures to the other blackspots on NH44 in the UT of JK national highways authority of india•Barnoti, Jammu•11-Oct-2023 | — | ₹33.55 Cr | — | Awarded: DRB INFRASTRUCTURE PRIVATE LIMITED | View |
| — | Construction of Vehicular Underpass at km 229.500 including Widening of New Service road, Exit-Entry, Dismantling, Reconstruction of Drain and Relocating of Highway Lighting on Panipat-Jalandhar section of old NH-1 (new NH 44) in the State of Punjab national highways authority of india•PIU Ambala•11-Oct-2023 | — | ₹24.95 Cr | — | Admitted-Finance | View |
| DQ | Maintenance of Hathikali to Narimbangalo sec of NH 54E from Km 83.400 to Km 140.700 (new NH-27) in the state of Assam on Performance Based Maintenance Contract (PBMC) national highways authority of india•NHAI HQ•08-Dec-2023 | — | ₹99.57 Cr | — | Awarded: M/S. D C Ajmera | View |
| L1 | Maintenance of Lanka to Hathikali sec of NH 54E from Km 22.000 to Km 83.400 (new NH-27) in the state of Assam on Performance Based Maintenance Contract (PBMC) national highways authority of india•NHAI HQ•08-Dec-2023 | ₹64.12 Cr | ₹93.91 Cr | -31.72% | Awarded (L1) | View |
| L3 | Constructing VUP With RE Wall Approaches at Chainage Km.319.960 and Service Road Chainage Km.319.560 Km.320.840 On NH 66 At Ambalpaddy For Rectification of Blackspot KA 02 373 In The State of Karnataka Under EPC Mode national highways authority of india•Ambalpadi•21-Dec-2023 | ₹24.66 Cr | ₹33.51 Cr | -26.4% | Rejected-Finance | View |
| — | Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli Kota section in the State of Rajasthan on EPC Mode national highways authority of india•NHAI RO JAIPUR•23-Feb-2024 | — | ₹79.26 Cr | — | Accepted-Technical | View |
| DQ | Strengthening/ Bituminous overlay work and Routine maintenance including incident management of Sangrur to Dogal Kalan Section of NH-52 from km.181.805 to km 211.390 of in the State of Punjab. national highways authority of india•PIU Chandigarh•07-Nov-2024 | ₹26.77 Cr | ₹34.42 Cr | -22.22% | Awarded: Varinder Kumar Contractor | View |
| DQ | Maintenance of existing stretch of NH-103 (Old NH-88) from Km. 96.500 to 131.000 of Shimla Mataur section in the state of Himachal Pradesh national highways authority of india•Ghumarwin to Kohli•16-Mar-2024 | — | ₹21.16 Cr | — | Rejected-Technical | View |
| — | CONSTRUCTION OF FOOT OVER BRIDGE AT 9 LOCATIONS ON GURGAON KOTPUTLI JAIPUR SEC OF national highways authority of india•PIU REWARI•07-Jun-2024 | — | ₹16.52 Cr | — | Accepted-Technical | View |
| DQ | Balance Overlay work on Yamunanagar-Saha- Panchkula section of (New NH-344) from km. 115.400 to km. 157.192 (Package-2) in the State of Haryana national highways authority of india•PIU Chandigarh•10-Jun-2024 | ₹9.58 Cr | ₹12.35 Cr | -22.44% | Awarded: RAJINDER INFRASTRUCTURE PVT LTD | View |
| L3 | Construction of Footpath-cum Drain on the edge of service road and widening of Peripheral Road on Both sides between km 86.000 to km 96.000 of old NH-01 (New NH-44) in Panipat City in the State of Haryana. national highways authority of india•PIU Ambala•28-Jun-2024 | ₹15.55 Cr | ₹17.47 Cr | -10.99% | Awarded: welkin india incorporate | View |
| L1 | Construction of 2 nos of FOBs with Ramps at Km.11600 Collectorate Baghpat and at Km 32000 Kendriya Vidyalaya, Baoli of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in the state of Uttar Pradesh on EPC mode national highways authority of india•Baghpat•09-Jul-2024 | ₹3.91 Cr | — | — | Awarded (L1) | View |
| DQ | O and M of 4lane of Harike Faridkot Kotkapura Bathinda sec of NH15(New NH-54)Km.168.400 to Km.287.215 (excl. Km. 170.000 to Km. 171.900 in Makhu town)in Punjab on PBMC mode (Flexible Pavement 28.663 Km Rigid Pavement 88.252 Kms) national highways authority of india•NHAI HQ•01-Aug-2024 | — | ₹117.00 Cr | — | Rejected-Technical | View |
| DQ | Six laning of Panipat- Khanna section of NH-44 from Km. 96.000 to Km. 272.000 in the state of Haryana and Punjab - Rectification of pavement surface along with other related works at various selected locations along NH-44. national highways authority of india•PIU Ambala•07-Aug-2024 | ₹8.05 Cr | ₹11.17 Cr | -27.92% | Awarded: welkin india incorporate | View |
| DQ | Slope stability and protection work of 7 nos. of vulnerable location along the Jowai-Ratacherra section of NH-6 in the state of Meghalaya on item rate (percentage) basis national highways authority of india•NHAI RO GHY•19-Aug-2024 | — | ₹76.19 Cr | — | Rejected-Technical | View |
| — | Construction of connecting road at BHS for six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun in the Uttar Pradesh and Uttarakhand on EPC under BMP Phase-1, package 1 and 2 national highways authority of india•Various Location•28-Aug-2024 | — | — | — | Accepted-Technical | View |
| — | Short Term Improvements and Routine Maintenance work of 4 lane stretch of Badaun Bareilly section of NH 530B from Ch.53.000 to Ch.96.150 in district Badaun and Bareilly in the state of Uttar Pradesh national highways authority of india•PIU Badaun•06-Nov-2024 | — | ₹11.54 Cr | — | Accepted-Technical | View |
| DQ | Strengthening/ Bituminous overlay work and Routine maintenace including incident management of Dogal Kalan to PB/ HR Border Section of NH-52 from km 211.390 to km 238.695 of in the State of Punjab national highways authority of india•RO Chandigarh•07-Nov-2024 | ₹29.16 Cr | ₹39.40 Cr | -26% | Awarded: SHRI BALAJI CONSTRUCTIONS | View |
| — | Construction of 17 no of FOBs on Four Laning from Km 0.00 to Km 42.00 of Dobaspet to Dodaballapur Bypass section of NH648 Old NH207 and 4L of km 42.00 to Km 80.00 of Dodaballapura Bypass to Hoskote section of NH648 Old NH207 in the state of Karnataka national highways authority of india•Dobaspet-Dodaballapura bypass-hoskote section•11-Nov-2024 | — | ₹27.02 Cr | — | Admitted-Finance | View |
| — | Construction of SafetyandSecurity Measures for Defense i.e Igloo, URP ESH,WP Shed, Buildings, RCC Drain,Road works and other works at Panjokhra within the notifiedzone of FASF, Naraingarh Road, Amb. Cantt at WSA Panjhokhra intheState of Har. and Pun. national highways authority of india•PIU Ambala•03-Jan-2025 | — | ₹53.45 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L1 | Construction of SafetyandSecurity Measures for Defense i.e Igloo, URP ESH,WP Shed, Buildings, RCC Drain,Road works and other works at Panjokhra within the notifiedzone of FASF, Naraingarh Road, Amb. Cantt at WSA Panjhokhra intheState of Har. and Pun. national highways authority of india•PIU Ambala•31-Jan-2025 | ₹51.07 Cr | ₹53.45 Cr | -4.45% | Awarded (L1) | View |
| — | Construction of 6 nos. of FOB at Km.34.500 (Badalpur), Km.42.800 (Dadri), Km.50.050 (Sikandrabad Industrial Area), Km.53.540 (Sikandrabad), Km.68.130 (Bulandshahr Dehat) and Km.83.100 (Khurja Dehat) on Ghaziabad Aligarh NH-34 in UP on EPC mode national highways authority of india•LUCKNOW•31-Jan-2025 | — | ₹21.49 Cr | — | Admitted-Finance | View |
| — | Construction of 7 nos. of FOB at Km.378.620 (Araul) Km.380.080 (Meduwa), Km.395.330 (Rasoolpur), Km.417.070 (Mariyani), Km.420.320 (Nonha Narsingh), Km.423.210 (Amiliha) and Km.431.640 (Naramau) on Aligarh - Kanpur Section of NH-34 in UP On EPC Mode national highways authority of india•LUCKNOW•01-Feb-2025 | — | ₹23.49 Cr | — | Accepted-Technical | View |
| — | Routine Maintenance work of stretch from Khanapara to Jagiroad from Km. 163.400 to Km. 205.00 (Balance portion of Guwahati Bypass, AS-03, AS-20) of NH 37 in the State of Assam, Length_41.60 Km national highways authority of india•NHAI RO GHY•25-Feb-2025 | — | ₹4.41 Cr | — | Accepted-Technical | View |
| — | slope protection work in Ghat Section from Km 219.280 to 226.750 of four Laning of Hassan Maranahalli Section of NH48 New NH75 from Km. 189.700 to Km.237.000 in the State of Karnataka on EPC mode national highways authority of india•NHAI-RO-Bangalore•04-Apr-2025 | — | ₹13.00 Cr | — | Admitted-Finance | View |
| — | Slope Protection Works for the location at Km 227.7 to 228.5 of four Laning of Hassan Marnahalli Section of NH48 New NH75 from Km. 189.700 to Km.237.000 in the State of Karnataka on EPC mode national highways authority of india•NHAI-RO-Bangalore•04-Apr-2025 | — | ₹28.55 Cr | — | Admitted-Finance | View |
| L1 | Preventive long term safety measures for slope protection at Dukkar Khind Chandani chowk and provision of street lighting at accident spots on Pune Satara section of NH 48 from Km 725 000 to Km 865 350 in the state of Maharashtra national highways authority of india•Pune•22-Apr-2025 | ₹12.88 Cr | — | — | Awarded (L1) | View |
| DQ | Construction of a 6-Lane VUP at MoRTH identified Blackspot (lD UP-03-213) at Km 197.115 (Dhamora Bypass starting point) on NH-530 in the state of Uttar Pradesh on EPC Mode national highways authority of india•Lucknow•22-Apr-2025 | — | ₹31.12 Cr | — | Rejected-Technical | View |
| DQ | Operation and Maintenance including Routine Maintenance and Incident Management of Four Laning of Ambala-Pehowa Balance Length Section of NH-152 from Km 0.000 to Km 3.700 and from Km. 46.200 to 95.360 in the State of Haryana for a Period of 1 Year national highways authority of india•PIU Ambala•02-May-2025 | ₹5.56 Cr | ₹8.40 Cr | -33.8% | Awarded: Vmaks Constructions Private Limited | View |
| DQ | Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana on item rate basis. national highways authority of india•NHAI HQ•14-May-2025 | — | ₹10.10 Cr | — | Awarded: Vmaks Constructions Private Limited | View |
| L1 | O and M of Punjabi Bagh to Tikri Border NH09 at start of Punjabi Bagh Underpass from Km.0.000 to Km.18.500 in the State of Delhi on item rate basis national highways authority of india•NHAI HQ•24-Jun-2025 | ₹12.94 Cr | ₹23.53 Cr | -45% | Awarded (L1) | View |
| L2 | Operation and Maintenance and Incident Management of Six lane Phagwara-Jalandhar section of NH-44 from Km.352.730 to Km. 387.100 part of Panipat-Jalandhar section in the State of Punjab on item rate basis national highways authority of india•RO-Chandigarh•26-Jun-2025 | ₹5.68 Cr | ₹7.88 Cr | -27.92% | Rejected-Finance | View |
| — | Construction of VUP along with service road at Kursena on Agra-Etawah Section of NH-19 in the state of Uttar Pradesh on EPC mode national highways authority of india•lUCKNOW•11-Jul-2025 | — | ₹31.11 Cr | — | Accepted-Technical | View |
| — | Request for Pre-Qualification (RFQ) - 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire/Contractor under jurisdiction of RO-Delhi. national highways authority of india•NHAI HQ•01-Aug-2025 | — | — | — | Admitted-Technical | View |
| — | Operation n Maintenance of Existing NH-148 A from Andheria mod to Delhi Haryana Border (MG Road) from Km. 0.000 to Km. 7.455 in the State of Delhi for 01 year national highways authority of india•NHAI HQ•04-Sep-2025 | — | ₹19.18 Cr | — | Admitted-Finance | View |
| — | Protection works and restoration of flood damaged stretches including Incident Management work from Ch.30.515 to 45.880 of Jagadhri-Poanta Sahib Road (NH-907) in the State of Haryana. national highways authority of india•PIU Chandigarh•02-Feb-2026 | — | ₹23.97 Cr | — | Admitted-Finance | View |
| — | Construction of LongTerm Remedial measures of River cutbank erosion at 2 Nos locations viz. RC19 km 296560 to km296710 and ARC23 295600 to 296560 between KULLU TO MANALI on KiratpurManali Section of NH-03 in the State of Himachal Pradesh on EPC mode national highways authority of india•PIU Mandi•27-Mar-2026 | — | ₹78.14 Cr | — | Accepted-Technical | View |
| — | Maintenance of existing stretch of NH 103 Old NH 88 from km 87200 to km 128000 of Shimla Mataur section in the state of Himachal Pradesh national highways authority of india•Hamirpur•09-Apr-2026 | — | ₹19.71 Cr | — | Accepted-Technical | View |
| — | Operation and Maintenance of NH 148A from junction of NH 48 (Gurugram) to Delhi/Haryana Border on item rate (percentage) basis national highways authority of india•NHAI HQ•15-Apr-2026 | — | ₹20.43 Cr | — | Admitted-Finance | View |
| — | Emergent restorstion and mitigation measures for monsoon preparation operational works and holy manimahesh yatra from Dharwala to Bharmour section km 106000 to 135000 of pathankot Chamba Bharmor NH 154A HP national highways authority of india•PIU-Palampur•02-Jun-2026 | — | ₹24.88 Cr | — | Accepted-Technical | View |
| L1 | Disposal of Various plant and machineries along with its accessories lying at MP (Shivpuri), Gujarat (Pardi , Sarigam and Amalsad) and UP (CIC, Noida) ircon international limited•New Delhi•20-Jul-2023 | ₹2.95 L | — | — | Awarded (L1) | View |
| L1 | NCRTC/SCRAP/OT/117 ircon international limited•New Delhi and UP•13-Mar-2024 | ₹37.40 L | ₹50.42 L | -25.83% | Awarded (L1) | View |
| L2 | Slope Mitigation Works-T15 ircon international limited•Ramban, Jammu and Kashmir•21-Dec-2024 | ₹12.56 Cr | ₹14.00 Cr | -10.25% | Awarded: SRM CONTRACTORS PRIVATE LIMITED | View |
| L2 | Misc. Works-BNL-2 ircon international limited•Ramban, J and K•17-May-2025 | ₹13.45 Cr | ₹13.45 Cr | 0% | Awarded: M/S SHAGUN ENTERPISES | View |