| L1 | Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode ministry of road transport and highways•Biaora Bypass•01-May-2023 | ₹61.97 Cr | ₹81.76 Cr | -24.21% | Awarded (L1) | View |
| L2 | Rehabilitation and Upgradation of existing intermediate lane to 2 lane with paved shoulders from Km 0.600 Gulganj Bypass on NH-34 to Km 43.000 Barna River, length 42.400 Km on Gulganj- Amanganj- Pawai-Katni NH-43 Ext. in the State of Madhya Pradesh ministry of road transport and highways•Barna River•01-May-2023 | ₹167.13 Cr | ₹190.38 Cr | -12.21% | Admitted-Finance | View |
| L1 | Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode ministry of road transport and highways•Kasrawad bypass, Selani bypass, Khargone bypass•01-May-2023 | ₹218.01 Cr | ₹299.10 Cr | -27.11% | Awarded (L1) | View |
| L8 | New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode ministry of road transport and highways•Ater Bypass and Bhind bypass•09-May-2023 | ₹174.44 Cr | ₹199.56 Cr | -12.59% | Admitted-Finance | View |
| L2 | Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode ministry of road transport and highways•Sarvardewla to Pal Road section of NH-347C•25-Aug-2023 | ₹267.50 Cr | ₹334.83 Cr | -20.11% | Admitted-Finance | View |
| L7 | Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode ministry of road transport and highways•Goras to Shyampur Road section of NH-552•25-Aug-2023 | ₹268.34 Cr | ₹308.83 Cr | -13.11% | Admitted-Finance | View |
| L17 | UP-GRADATION OF PICHHORE- DINARA SECTION OF NH-346, FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE ministry of road transport and highways•PICHHORE- DINARA SECTION OF NH-346•13-Feb-2024 | ₹227.02 Cr | ₹299.15 Cr | -24.11% | Admitted-Finance | View |
| — | Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.590 km to 2 Lane with paved shoulder configuration along with OTI in 5.88 km length in the State of Madhya Pradesh on EPC Mode ministry of road transport and highways•Ambua to Gujrat Border•01-Mar-2024 | — | ₹255.20 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Upgradation of Multai to MP/MH Boarder section of NH-347A from 0.00 to 23.94 to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode ministry of road transport and highways•Multai to MH Boarder section of NH-347A•01-Mar-2024 | — | ₹240.42 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L1 | Construction of 6 lane flyover from Khapari ROB to Mihan Interchange and upgradation of existing 4 LPS road to 6 LPS with service road by flexible pavement in section of Nagpur - Hyderabad in the state of Maharashtra on EPC mode ministry of road transport and highways•Khapari•08-Mar-2024 | ₹332.01 Cr | ₹430.04 Cr | -22.8% | Awarded (L1) | View |
| L1 | Rehabilitation and Up-gradation of Jarud - Sirsala section of NH-361F km 59.500 to km115.00 to Two lane with paved shoulder/ Four Lane in the state of Maharashtra on EPC mode. ministry of road transport and highways•Sirsala•09-Mar-2024 | ₹288.97 Cr | ₹396.99 Cr | -27.21% | Awarded (L1) | View |
| L13 | Strengthening, Upgradation and Widening of Nandur Shigote Kolhar Section of NH-160D km. 00.00 to 47.370 Nandur Shingote Kolar Section Total Length 47.37 km. 2L. PS Configuration in the State of Maharashtra on EPC Mode. ministry of road transport and highways•Nandur Shigote Kolhar Section of NH-160D km. 00.0•30-Aug-2024 | ₹189.60 Cr | ₹246.90 Cr | -23.21% | Admitted-Finance | View |
| — | Maintenance Contract on Mihona-Lahar-Daboh Length 26.62 km on NH-552 Ext. in the state of Madhya Pradesh on Performance Based Maintenance Contract PBMC mode ministry of road transport and highways•WORKS•07-Oct-2024 | — | ₹21.02 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Maintenance Contract on Daboh-Bhander-Chirgaon Length 45.63 km on NH-552 Ext. in the state of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) mode ministry of road transport and highways•WORKS•07-Oct-2024 | — | ₹32.81 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Rectification of Accident Black Spots and other identified hazardous locations for road safety work from km 1184.322 to 1380.387 in Baran Shivpuri Jhansi Section of NH27 national highways authority of india•NHAI RO Bhopal•15-May-2020 | — | ₹3.77 Cr | — | Admitted-Finance | View |
| — | Balance work of 4 laning of Indore Gujarat MP Border from km 106.210 to km 115.250 Machilya Ghat Section and Forest portion km 149.80 to km 150.85 of NH-47 on EPC Mode in the State of Madhya Pradesh. national highways authority of india•NHAI HQ•01-Sep-2020 | — | ₹258.14 Cr | — | Admitted-Finance | View |
| — | Restoration of Rutting and Alligator Cracking on Four Lane of Baran Shivpuri Jhansi Section from Km. 1184.322 to Km. 1380.387 of NH 27 in the State of Raj. MP and UP. national highways authority of india•RO Bhopal•06-Nov-2020 | — | ₹41.72 Cr | — | Accepted-Technical | View |
| — | Short term repair and Routine Maintenance under One Time Improvement of Bypassed sections of Old NH 7 in Tewari Sleemanabad Chaapara Dhangawa Sihora Jujhari and Gosalpur Gandhigram and Panagar Bargi Sukari Dhuma and Lakhnadon Town in the state of MP national highways authority of india•NHAI RO BHOPAL•09-Nov-2020 | — | ₹10.86 Cr | — | Accepted-Technical | View |
| — | Balance work of four laning of Gwalior Shivpuri from existing Ch. 215.000 (design Ch. 100.757) to existing Ch. 221.500 (design Ch.107.350) section of NH3 passing through Madhav National Park (Total length-6.593 km) in MP on EPC Mode basis. national highways authority of india•NHAI HQ•25-Sep-2020 | — | ₹162.15 Cr | — | Admitted-Finance | View |
| — | Engagement fee collection agency on the basis of EQ through EQ for Kachnaria FP in Rajgarh District at km 419.200for 4 lanes with paved shoulder of Bhopal Biaora section from design km. 315.725 tokm. 421.325 of NH12 in MP executed on EPC mode national highways authority of india•NHAI HQ•21-Dec-2020 | — | ₹14.85 Cr | — | Admitted-Fee/PreQual/Technical/Finance | View |
| — | Engagement of user fee collection agency basis of through EQ basis for Sonkacch FP in Sehore District at km 335.200 for 4 lanes with paved shoulder section of Bhopal Biaora from Design km. 315.725 to . 421.325 of NH12 in MP executed on EPC mode. national highways authority of india•NHAI HQ•21-Dec-2020 | — | ₹25.07 Cr | — | Admitted-Fee/PreQual/Technical/Finance | View |
| — | Balance 11.96 km. stretch between Km.66.000 to Km.77.960 on NH-12(New NH-45) in Nauradehi Wildlife Sanctuary in the State of Madhya Pradesh on EPC Mode Basis national highways authority of india•NHAI HQ•24-Dec-2020 | — | ₹161.97 Cr | — | Accepted-Technical | View |
| L2 | Emergent repair work from Indore to Dhar section on Risk and Cost of the Concessionaire For 4 laning of Indore Gujrat MP Border on BOT Toll basis from Km 9.500 to Km 171.000 of NH 59 on DBFOT in the State of Madhya Pradesh under NHDP Phase national highways authority of india•NHAI RO BHOPAL•13-Jun-2023 | ₹16.37 Cr | ₹18.10 Cr | -9.6% | Rejected-Finance | View |
| — | Construction of LVUPs at Km 153 600 at Adhegaon and at Km 217 565 At Mohol on NH 65 and 4 laning of Tembhurni town portion from Old Ch Km 153 050 To Km 159 280 with Design Length 6 230 Km in Pune Solapur section of NH 09 in the State Maharashtra EPC national highways authority of india•Solapur•22-Jun-2021 | — | ₹82.83 Cr | — | Accepted-Technical | View |
| — | Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of 1305.087 54.087 MP to 1305.087 54.087 MP tolling reach of Raksha of Shivpuri Jhansi Section of New NH27 in the state of MP and UP national highways authority of india•NHAI RO Bhopal•16-Jul-2021 | — | ₹6.87 Cr | — | Not Admitted-Finance | View |
| L1 | Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of 1251.814 615.814 RJ MP Border) and 0.00 MP to 1305 087 54.087 MP tolling reach of Ramanagar Toll Plaza of Baran Shivpuri Section of New NH27 national highways authority of india•NHAI RO Bhopal•16-Jul-2021 | ₹3.10 Cr | ₹4.69 Cr | -33.81% | Awarded (L1) | View |
| L1 | Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of Ch. 1184.322 548.322 Raj to 1251.814 615.814 RJ MP Border 0.00 MP tolling reach of Mundiyar Toll Plaza of Baran Shivpuri Section of New NH27 national highways authority of india•NHAI RO Bhopal•16-Jul-2021 | ₹4.10 Cr | ₹6.04 Cr | -32.11% | Awarded (L1) | View |
| — | Reconstruction of damaged section and patchwork on potholes on the stretch from Bhopal (Km 315.725) to Biaora (Km 421.325) section of NH-12 on the state Madhya Pradesh national highways authority of india•Bhopal•20-Sep-2021 | — | ₹4.50 Cr | — | Admitted-Finance | View |
| DQ | Restoration of Rutting national highways authority of india•Works•07-Jul-2022 | — | ₹30.67 Cr | — | Rejected-Technical | View |
| L1 | Miling and BC overlay work in Shivpur Jhansi section of NH 27 national highways authority of india•Shivpuri-Jhansi•18-Oct-2022 | ₹26.04 Cr | ₹30.67 Cr | -15.11% | Awarded (L1) | View |
| L1 | Improvement of existing alignment of Pandharpur Town Part bypassed section from Wakhari to Lord Vitthal Temple Length 8 km in the State of Maharashtra on EPC Mode national highways authority of india•Pandharpur•01-Mar-2023 | ₹83.71 Cr | ₹114.75 Cr | -27.05% | Awarded (L1) | View |
| L2 | Routine Maintenance works of Lalitpur-Sagar-Lakhnadon stretch from Km 99.005 to Km 415.089 Section of NH-44 national highways authority of india•Work•05-Jul-2023 | ₹25.38 Cr | ₹37.95 Cr | -33.11% | Rejected-Finance | View |
| — | Construction of 4L from Amjhar Road to Barela (Jabalpur Ring Road Pkg 5) from design km 98.950 (Near Amjhar) to km 113.925 and km 0.000 to Km 2.900 (Near Barela) (Total design Length 17.875 km) under NH(O) in Madhya Pradesh on HAM national highways authority of india•NHAI HQ•15-Dec-2023 | — | ₹442.57 Cr | — | Admitted-Finance | View |
| — | Two Lane with Paved Shoulders of Roshni to Ashapur (Betul to Khandwa Pkg III) from Design Km 89.900 to Design Km 114.000 section in the State of Madhya Pradesh on EPC Mode. national highways authority of india•NHAI HQ•29-Dec-2023 | — | ₹304.22 Cr | — | Admitted-Finance | View |
| — | Balance work for construction of 2-lane with paved shoulder from km 80.800 to km 85.250 (Satna-Maihar) section of NH 135BG (design length 4.450 km) in the state of Madhya Pradesh on EPC mode national highways authority of india•NHAI HQ•12-Aug-2024 | — | ₹67.51 Cr | — | Admitted-Finance | View |
| L1 | Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode. national highways authority of india•NHAI HQ•19-Aug-2024 | ₹322.40 Cr | ₹353.45 Cr | -8.78% | Awarded (L1) | View |
| DQ | Improvement of riding quality and routine maintenance with other ancillary work, safety work etc. of existing Gwalior Shivpuri Section of NH 46 from Km 00.000 to Km 125.380 (Excluding 100.757 to 107.350) in state of MP national highways authority of india•NHAI RO Bhopal•21-Oct-2024 | — | ₹209.01 Cr | — | Rejected-Technical | View |
| — | Construction of LVUP/VUP at Km. 332.900 Jhirniya at Km 357.420 Hingoni at Km 378.490 Badodia Talab at Km 395.600 Gadiya and at Km. 390.950 Narsinghgarh Junction on Lalghati 315.725 to Biaora 421.325 section of New NH46 in the state of MP on EPC mode national highways authority of india•NHAI RO Bhopal•12-Nov-2024 | — | ₹92.08 Cr | — | Admitted-Finance | View |
| — | Construction of SVUP, LVUP, VUP at Km 109.420 Bhaghel Dhaba at Km 111.360 Police Station Ruthiyai bypass at Km 116.140 NFL at Km 118.400 Sada Colony and at Km 137.020 Barkheda Khurd alongwith Junction Improvement at K. 119.140 Bharsula junction/JP national highways authority of india•NHAI RO Bhopal•12-Nov-2024 | — | ₹98.42 Cr | — | Admitted-Finance | View |
| — | Construction of LVUP/VUP at Km 149.870 Jaisinghpura at Km 155.030 Binaganj Bypass at Km 183.780 Aranya Jod at Km 188.870 Reliance Petrol Pump on Guna Biaora section of NH46 in the state of MP on EPC mode national highways authority of india•NHAI RO Bhopal•12-Nov-2024 | — | ₹99.97 Cr | — | Admitted-Finance | View |
| — | Strengthening of Service road from Ch. 315.725 to Ch. 323.350 with white topping and reconstruction with PQC from Ch. 323.350 to 324.000 on Bhopal Biaora section of NH46 in the state of MP on EPC mode national highways authority of india•NHAI RO Bhopal•12-Nov-2024 | — | ₹25.41 Cr | — | Admitted-Finance | View |
| DQ | Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B in Gadchandur Town in the State of Maharashtra on EPC Mode national highways authority of india•NHAI HQ•04-Jan-2025 | ₹103.02 Cr | ₹145.53 Cr | -29.21% | Awarded: vindhya construction company | View |
| — | Design and Construction of VUP and Service roads on Biaora Dewas section of NH 52 under Road safety improvement in the State of Madhya Pradesh national highways authority of india•RO Bhopal•03-Feb-2025 | — | ₹84.96 Cr | — | Admitted-Finance | View |
| — | Design and Construction of VUP and Service roads on Indore Gujarat section of NH 47 under Road safety improvement in the State of Madhya Pradesh on Engineering, Procurement and Construction EPC Contract national highways authority of india•RO Bhopal•03-Feb-2025 | — | ₹168.58 Cr | — | Admitted-Finance | View |
| DQ | Construction of i.3-lane VUP Uni Directional at km 172.000 at Start of Beed Bypass ii. 3-lane VUP Uni Directional at km 184.280 at the End of Beed Bypass and iii.Construction of Service Roads from Km 173.060 to 173.760, Km175.840 to Km 176.480,Km 179 national highways authority of india•NHAI RO NAGPUR•25-Feb-2025 | ₹102.15 Cr | ₹148.49 Cr | -31.21% | Rejected-Finance | View |
| L1 | RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode. national highways authority of india•NHAI HQ•17-Oct-2025 | ₹153.50 Cr | ₹245.11 Cr | -37.38% | Awarded (L1) | View |
| — | Short Term Improvement and Routine Maintenance work of tolling reach of Mundiyar FP frm km 1184.322 to 1251.814 Length 67.492 Km on Baran Shivpuri Sec of New NH 27 in Rajasthan on PBMC Mode national highways authority of india•NHAI HQ•25-Apr-2025 | — | ₹96.62 Cr | — | Admitted-Finance | View |
| — | Short Term Improvement and Routine Maintenance work of tolling reach of Ramnagar FP from km 1251.814 to 1305.087 L53.273 Km on Baran Shivpuri Sec of New NH27 in Madhya Pradesh on PBMC Mode. national highways authority of india•NHAI HQ•25-Apr-2025 | — | ₹87.51 Cr | — | Admitted-Finance | View |
| L1 | Design and Construction of Flyover VUP LVUP at 04 locations for permanent rectification of MoRTH identified Blackspot locations i.e. CRPF camp Shivpuri Bypass End Point Mohrai Tiraha on NH46 Cut Point Shivpuri Link Road Karai Dada and Teela Road Coll national highways authority of india•RO Bhopal•25-Apr-2025 | ₹108.09 Cr | ₹154.33 Cr | -29.96% | Awarded (L1) | View |
| DQ | One Time Improvement of bypassed section of NH361 (Length3.430 km) in Kelzar Town on Wardha Butibori Section of NH361 in the State of Maharashtra on EPC Mode national highways authority of india•NHAI RO Nagpur•25-Aug-2025 | ₹16.64 Cr | ₹20.32 Cr | -18.11% | Rejected-Finance | View |
| L2 | Const of new Slip Service road at various locations L30.28 km LHS RHS and Flyover(2x30m)at Sawadgaon Phata(Km.310.380)on Dhule Pimpalgaon sec of NH60 Km. 261.720 to Km. 380.000 in Maharashtra on EPC mode under NH(O) national highways authority of india•NHAI HQ•09-Sep-2025 | ₹179.55 Cr | ₹273.41 Cr | -34.33% | Awarded: SWASTIK INFRALOGICS PRIVATE LIMITED | View |
| L1 | Construction Longterm Rectification of 03 Nos of Blackspots Gram Madai Village Gorakhpur Chauraha and Nagjhar Bypass Tiraha by Constructing 6 Lane Vehicular Underpasses at Km 550.650 Km 580.560 and Km 597.090 in Lakhnadon to Khawasa Section of NH 44 national highways authority of india•NHAI RO Bhopal•19-Sep-2025 | ₹79.87 Cr | ₹109.73 Cr | -27.21% | Awarded (L1) | View |
| — | Strengthening reconstruction of existing service road (12.864 km) and construction of 0.66km de-scope Service road with Rigid pavement on Obedullaganj-Itarsi section of NH-46 national highways authority of india•NHAI PIU-Bhopal•11-Nov-2025 | — | ₹33.46 Cr | — | Accepted-Technical | View |
| L1 | Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch. 61.878 and 63.845 for Jamb Junction in the State of Maharashtra on EPC mode. Regarding appraisal by IAC national highways authority of india•NHAI HQ•13-Nov-2025 | ₹76.45 Cr | ₹123.58 Cr | -38.13% | Awarded (L1) | View |
| — | Profile raising and strengthening of existing flexible pavement including flexible overlay (2.12 km) and reconstruction (22.817 km) along with 04years routine maintenance of Bhopal-Biaora section from Km.394.923-Km.421.450 of NH-46 in MP on Item Rate national highways authority of india•NHAI HQ•18-Dec-2025 | — | ₹166.01 Cr | — | Admitted-Finance | View |
| — | Strengthening reconstruction of existing service road 13.40 km with Rigid pavement on Bhopal Biaora section of NH 46 2nd Call national highways authority of india•PIU Bhopal•23-Jan-2026 | — | ₹36.92 Cr | — | Accepted-Technical | View |
| L4 | Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode. ministry of road transport and highways•Nandurbar•10-Dec-2024 | ₹407.01 Cr | ₹608.47 Cr | -33.11% | Admitted-Finance | View |
| L17 | Upgradation and construction of Multai to MH Border Road section of NH-347A from Design Chainage 0.000 to 23.94 Km (Total length 23.94 km) to 2L with paved shoulder configuration along with one time improvement in 5.80 km length in the State of Made ministry of road transport and highways•Multai to MH Boarder section of NH-347A•17-Jan-2025 | ₹175.00 Cr | ₹240.42 Cr | -27.21% | Admitted-Finance | View |
| L5 | Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode ministry of road transport and highways•Mandla - Nainpur Section of NH 543•14-Jan-2025 | ₹322.32 Cr | ₹442.20 Cr | -27.11% | Admitted-Finance | View |
| L9 | Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.59km to 2 Lane with paved shoulder configuration along with one time improvement in 5.88 km length in the State of Madhya Pradesh on EPC Mode ministry of road transport and highways•Ambua to Gujrat Border•17-Jan-2025 | ₹183.42 Cr | ₹255.50 Cr | -28.21% | Admitted-Finance | View |
| L3 | PBMC work of Rigid pavement of NH 752-B Biaora Maksudangarh section from Km 3/150 to Km 38/700, km 42/030 to km 42/510, length 36.03 km, in the state of Madhya Pradesh ministry of road transport and highways•NH 752-B Biaora Maksudangarh section•04-Mar-2025 | ₹10.41 Cr | ₹16.05 Cr | -35.11% | Admitted-Finance | View |
| L6 | Rehabilitation and Upgradation of Sendhwa to Khetiya (MP/MH Border) Section from km 0/000 to km 55/600 of NH-752(G) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode. ministry of road transport and highways•Sendhwa to Khetiya section•26-Mar-2025 | ₹298.54 Cr | ₹460.78 Cr | -35.21% | Admitted-Finance | View |
| L7 | Construction of 2-Lane ROB At LC No.AB-27 (Belbahara ROB) on Manendragarh To Ambikapur Section Of NH-43 (Old NH-78) At NH Km 264.000 and Railway Chainage 937.14-15 Between Udalkachar-Boridand Stations in the State of Chhattisgarh ministry of road transport and highways•Belbahara•26-Apr-2025 | ₹59.92 Cr | ₹63.15 Cr | -5.11% | Admitted-Finance | View |
| DQ | Performance Based Maintenance Contract Cost Estimate from Km. 92.025 to Km 158.060 of NH-76 in the State of Uttar Pradesh ministry of road transport and highways•Mahoba•11-Jun-2025 | — | ₹54.49 Cr | — | Rejected-Technical | View |
| L12 | Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, from design Km 237.600 to Km 292.750 (Design Length-55.150 Chanderi link bypass) in the State of Madhya Pradesh ministry of road transport and highways•Chanderi-Pichhore roadsection of NH-346•17-Jun-2025 | ₹219.57 Cr | ₹310.17 Cr | -29.21% | Admitted-Finance | View |
| L5 | Rehabilitation of Existing Distressed Road Section of Loni-Burhanpur on NH-347C in the State of Madhya Pradesh on EPC Mode ministry of road transport and highways•Loni-Burhanpur on NH-347C•18-Jun-2025 | ₹36.93 Cr | ₹42.07 Cr | -12.21% | Admitted-Finance | View |
| L5 | Rehabilitation and upgradation of the Talegaon Warud Gonapur (MP Border) section of NH347A from design km 14/300 to km 19.480, km 24.160 to km 24.850 km 31.060 to km 47.000 and km 48.000 to km 60.820 to two lane with paved shoulder configuration in ministry of road transport and highways•Warud•04-Oct-2025 | ₹111.74 Cr | ₹172.19 Cr | -35.11% | Admitted-Finance | View |
| DQ | AAI/CHQ/Engg(NR)/Gwalior/Apron airports authority of india•Gwalior Airport•28-Dec-2021 | ₹33.10 Cr | ₹38.51 Cr | -14.06% | Awarded: VVC Real Infra Pvt Ltd | View |
| DQ | CONSTRUCTION OF OPERATIONAL AREA STORM WATER RCC DRAIN AND GRADING OF BASIC STRIP AT IMPHAL AIRPORT, IMPHAL (MANIPUR) airports authority of india•Imphal•24-Feb-2023 | ₹61.93 Cr | ₹73.91 Cr | -16.21% | Awarded: Kaluwala Construction Company | View |
| — | RFP for Rehabilitation and Up-gradation from Km. 0.000 to Km. 51.600 of NH-321G (Agra (Junction on NH-509 at Tedhi Baghia) to Nuhkhas) to two lane with paved shoulder configuration in the state of Uttar Pradesh on (EPC) Basis Contract. ministry of road transport and highways•Agra•26-Feb-2026 | — | ₹390.09 Cr | — | Admitted-Fee/PreQual/Technical | View |