Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
AS
Government ContractorVerified Bidding RecordPublic Works

A S PATEL

Aggregated public procurement dossier compiling official financial evaluations, competitive bidding ranks (L1, L2, L3), and tender awards.

Historical Win Rate22 Wins
32.8%award ratio

22 awarded across 67 participated tenders

Primary Issuing Authorities:ministry of road transport and highwaysnational highways authority of india
Official Central e-Procurement Evaluation Data

Total Tenders Bidded

67

Evaluated bids submitted

Official L1 Wins

22

Lowest responsive bidder

Won Contracts Value

₹189.40 Cr

Cumulative awarded volume

Total Quoted Pipeline

₹303.52 Cr

Aggregated financial quotes

Competitive Position & Rank Distribution

Historical rank distribution across technical evaluations and financial openings

Average Margin vs Estimate: -25.35%
Bidding Outcome Proportion67 Total Evaluated Bids
L132.8%

22

Winning Bid

L23.0%

2

Runner Up

L31.5%

1

3rd Lowest

L4+4.5%

3

Higher Ranks

DQ11.9%

8

Disqualified

Profile Summary & Procurement Overview

A S PATEL is an active participant in public government e-procurement tenders. Across documented records, the contractor has placed financial quotes for 67 distinct tenders, achieving the lowest conforming bid position (L1) on 22 tenders with a historical win rate of 32.8%.

The contractor has executed or been awarded project works amounting to ₹189.40 Cr. In competitive bidding assessments, the firm has also finished as the secondary bidder (L2) in 2 tenders. Primary issuing authorities include ministry of road transport and highways, national highways authority of india.

Tender Bidding Archive & Historical Records

Evaluation records and financial bids submitted by A S PATEL

RankTender & AuthorityQuoted BidEstimated CostMarginOutcomeLink
2nd Attempt Work of short term road safety work on NH-47 from km. 0/00 to 16/00 (Narol-Ujala-Vishala-Sarkhej road) in the state of Gujarat (Job No.47/GJ/2022-23/699)
ministry of road transport and highwaysAhmedabad13-Jul-2023
Accepted-TechnicalView
L3Periodical renewal work and incident management services IMS from Km 180 500 End of Nagaur Bypass to Km 267 500 Netra Village of NH 62 in the state of Rajasthan on EPC mode
ministry of road transport and highwaysNAGAUR08-Jul-2023
₹50.33 Cr₹40.45 Cr+24.42%Admitted-FinanceView
L14th Attempt Short Term Maintenance works and activities on section from Narol to Ujala Ch Km 0.000 to 12.000
ministry of road transport and highwaysAhmedabad04-Dec-2023
₹5.13 CrAwarded (L1)View
L2Strengthening of NH 566 from Km. 0.00 to Km. 4.00 Dhavali bypass on EPC Mode in the State of Goa under NH O Annual Plan 2023-24.
ministry of road transport and highwayswork29-Nov-2023
₹13.23 Cr₹17.64 Cr-24.99%Admitted-FinanceView
L4Strengthening of NH 748 from Km. 118.00 to Km. 125.00 Khandepar to Safa Masjid on EPC Mode in the State of Goa under NH O Annual Plan 2023 24.
ministry of road transport and highwayswork29-Nov-2023
₹22.62 Cr₹29.91 Cr-24.39%Admitted-FinanceView
L1Execution of Balance work for the work of Widening from existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the State of Gujarat under NH (O) on EPC mode
ministry of road transport and highwaysVadali08-Jan-2024
₹13.26 CrAwarded (L1)View
Strengthening of service roads of NH-147 Chiloda-Gandhinagar-Sarkhej Road Km. 0/000 to 44/040 in the state of Gujarat on EPC mode. Job No. 147/GJ/2023-24/741
ministry of road transport and highwaysGandhinagar13-Mar-2024
Accepted-TechnicalView
2nd Attempt Strengthening of service roads of NH-147 Chiloda-Gandhinagar-Sarkhej Road Km. 0/000 to 44/040 in the state of Gujarat on EPC mode. Job No. 147/GJ/2023-24/741
ministry of road transport and highwaysGandhinagar06-Aug-2024
Accepted-TechnicalView
L9Bhalej Sarasa Road S.H. Km. 5/600 to 15/600 Dist. Anand.
ministry of road transport and highwaysANAND31-Aug-2024
₹10.41 Cr₹9.09 Cr+14.48%Admitted-FinanceView
Ligada Bhalej Anand Road S.H. Km. 0/000 to 19/200 Dist. Anand.
ministry of road transport and highwaysANAND31-Aug-2024
₹33.41 CrAccepted-TechnicalView
Resurfacing of Modasa Meghraj Undava Road Km.0/00 To 14/400 CRIF Work Pro. Road Furniture and other Misc work Taluka Modasa District Arvalli
ministry of road transport and highwaysMODASA30-Oct-2024
₹3.76 CrAccepted-TechnicalView
Short-Term Improvement and Routine Maintenance of Existing Road of Kodinar-Veraval Section
national highways authority of indiaveraval04-Jan-2020
₹3.76 CrAccepted-TechnicalView
Maintenance work of existing Road of Prachi bypass from Ch 240 300 to Ch 243 550 Gorakhmadhi bypass from Ch 247 200 to 248 900 and Kajali bypass from Ch 258 400 to Ch 263 180 of KodinarVeraval Section of NH8E in the state of Gujarat
national highways authority of indiaveraval09-Sep-2020
Accepted-TechnicalView
Operation and Maintenance of 4laning of Mahulia- Bharagora-JH/WB Border Sec of NH-33(from Km.277.500 to Km. 333.500)and NH49(from Km.199.200 to Km.183.587)(Total length 71.61 km.) on PBMC in the State of Jharkhand
national highways authority of indiaNHAI HQ12-Jan-2024
₹46.51 CrAdmitted-Fee/PreQual/TechnicalView
Operation Maintenance of Kota Bypass Section from Km 1052.429 to Km1080.263 (total length 26.434 Km) excluding 1.4 Km length of Cable Stayed Kota of NH 27 in the State of Rajasthan
national highways authority of indiaNHAI PIU Kota06-Jul-2021
₹13.82 CrAdmitted-FinanceView
L1Short term repair, routine maintenance and Incident Management of Start of Sangrur Bypass to Tapa section of NH-64 (New NH-07) from km 110.720 to Km 175.000.
national highways authority of indiaBathinda16-Jul-2021
₹5.41 CrAwarded (L1)View
L1Short term repair, routine maintenance and Incident Management of Tapa to Bathinda section of NH-64 (New NH07) from km 175.000 to km 216.350 for 01 years
national highways authority of indiaBathinda03-Nov-2021
₹2.82 CrAwarded (L1)View
Maintenance work and activities(including incident management) on section from Padhi to DahodKm.180/000toKm.267/000 (DesignCh.180/000-Ch.265/588 (85.58Km)of 2L with paved shoulder ofsection of NH-113(NewNH-56) in the state of Rajasthanand Gujarat
national highways authority of indiaNHAI, Regional Office, Gandhinagar10-Nov-2021
₹8.13 CrAccepted-TechnicalView
Short term repair, routine maintenance and Incident Management of exiting 4 lanes with paved shoulder of Hari-Zira-Farid-Katka-Bath Sect. of old NH15 (new NH-54) from km 166.925 km 287.615 incl. all Bypasses in the State of Pun
national highways authority of indiaBathinda17-Nov-2021
Admitted-FinanceView
DQOperation and maintenance including Incident Management of Zirakpur to Patiala section of NH-64 (NH-07) from km. 0.000 to km. 50.000 under NHDP-IV in the State of Punjab
national highways authority of indiaPATIALA20-Jan-2022
₹7.41 Cr
Awarded: Vmaks Constructions Private Limited
View
DQShort term repair, routine maintenance and incident Management of Start of Sangrur to Dogal Kalan of NH-71 (New NH-52) from km. 181.805 to 211.450 in the State of Punjab for the period of one year
national highways authority of indiaPATIALA22-Jan-2022
₹2.75 Cr₹3.89 Cr-29.29%
Awarded: Vmaks Constructions Private Limited
View
Short term Improvements and routine maintenance of Vadodara - Bharuch from Km.108.700 to 192.000 section on NH-48.
national highways authority of indiaNHAI, Regional Office, Gandhinagar22-Jan-2022
₹16.31 CrAccepted-TechnicalView
Short Term Improvements and routine maintenance of Surat - Bharuch from Km. 198.700 to Km. 264.000 section on NH-48.
national highways authority of indiaNHAI, Regional Office, Gandhinagar24-Jan-2022
₹17.81 CrAccepted-TechnicalView
DQAnnual Maintenance and Incident Management of Ahmedabad-Godhra Section from Km.4.200 to Km.122.420 on NH-47 in the State of Gujarat.
national highways authority of indiaNHAI, Regional Office, Gandhinagar07-Sep-2022
₹8.24 CrRejected-TechnicalView
L1Routine Maintenance and Incident Management of 4/6 laning of UP/HR Border-Yamunanagar- Saha-Barwala-Panchkula Section of NH-344 (Old NH-73) from km. 70.830 to km. 157.192 (Package-I and II) in the State of Haryana
national highways authority of indiaChandigarh29-Jun-2022
₹6.64 Cr₹10.00 Cr-33.6%Awarded (L1)View
L1Improvement and Routine Maintenance including incident management of stretch from start of Patiala Bypass to start of Sangrur Bypass section of NH 64 New NH-07 Km 50.000 to 110.720 in State of Punjab
national highways authority of indiaPATIALA25-Aug-2022
₹5.54 Cr₹9.57 Cr-42.09%Awarded (L1)View
L1Short Term Improvements and routine maintenance of Vadodara-Surat section from Km.192.000 to 198.745 on NH-48 in the state of Gujarat
national highways authority of indiaBharuch21-Sep-2022
₹2.29 Cr₹2.90 Cr-20.9%Awarded (L1)View
L1Short term Improvement including overlay and construction of Sand Retaining wall (RR Stone Masonry) of Sundra to BinjradKaTala via Myajlar (Km. 46.000 to 82.600) of NH 70, in the state of Rajasthan
national highways authority of indiaNHAI RO JAIPUR29-Apr-2023
₹16.41 Cr₹14.92 Cr+9.98%Awarded (L1)View
Routine maintenance for 2 lane with paved shoulder of Karauli to Dholpur section of 11B from km 83.960 to 184.860 (Length 100.900Km) in state of Rajasthan
national highways authority of indiaNHAI RO Jaipur01-Feb-2024
₹13.55 CrAccepted-TechnicalView
Routine Maintenance works for Palanpur/Khemana to Abu Road to Swaroopganj section (from Km. 601.000 to Km. 677.000) of NH27 in the State of Gujarat and Rajasthan
national highways authority of indiaNHAI HQ15-Feb-2024
₹2.00 CrAdmitted-FinanceView
Short term Improvement and routine maintenance of Vadodara-Surat Section from Km 192.000 to 198.745 on NH-48 in the State of Gujarat.
national highways authority of indiaNHAI, Regional Office, Gandhinagar14-Mar-2024
₹2.79 CrAdmitted-Fee/PreQual/TechnicalView
Short term measures for road safety in Dhanua Ghati section of NH 2 from km 249.525 to km 261.150 in the State of Jharkhand
national highways authority of indiaPIU-Hazaribagh28-May-2024
₹3.44 CrAccepted-TechnicalView
L1Operation and Maintenance of 4-laning of Ayodhya - Gorakhpur Section (From km. 142.810 to km 252.860) of NH-28 (new NH-27)
national highways authority of indiaGorakhpur08-Jun-2024
₹2.76 Cr₹25,000+110390.62%Awarded (L1)View
L1Operation and Maintenance of 2 and 4 laning of Rudhauli to Basti
national highways authority of indiaGorakhpur08-Jun-2024
₹2.48 Cr₹25,000+99207.72%Awarded (L1)View
DQOperation and Maintenance of Four laning of Mahulia-Bharagora-JH-WB Border Section of NH-33 (from Km.277.500-Km.333.500) and NH-49 (from Km.199.200-Km.183.587) (Total length 71.61 km.) on PBMC in the State of Jharkhand
national highways authority of indiaNHAI HQ10-Jun-2024
₹46.83 CrRejected-TechnicalView
L1Operation Maintenance of Two Laning with Paved Shoulder of Bhilwara Ladpura section of NH 758 From km 87.250 to Km 155.000 (Total length 67.750 kms) in Rajasthan on Performance Based Maintenance Contract (PBMC)
national highways authority of indiaNHAI HQ25-Jul-2024
₹47.05 Cr₹64.18 Cr-26.69%Awarded (L1)View
L2Implementation of road furniture and other safety measures, short term measures at 2 nos blackspot locations, and annual maintenance including incident management on Ahm-Godhra section of NH-47 from Km04.200 to 122.420 in the state of Gujarat
national highways authority of indiaNHAI, Regional Office, Gandhinagar16-Aug-2024
₹14.80 Cr₹23.52 Cr-37.08%
Awarded: Shree Construction
View
L1Road Safety Measures and Operation and Maintenance
national highways authority of indiaGoa29-Aug-2024
₹2.39 CrAwarded (L1)View
Routine Maintenance and Periodic renewal work of 2 lane with paved shoulder 4-lane of Barmer-Bagundi Km 0.00 to Km 74.100 of NH-25 in the state of Rajasthan on Performance Based Maintenance Contracts (PBMC) mode
national highways authority of indiaNHAI HQ02-Sep-2024
₹67.28 CrAdmitted-FinanceView
L1Empanelment of Agencies to carry out emergent works up to Rs. 25 Cr(Class-D) at the Risk and Cost of Contractor-Concessionaire in the State of Gujarat as per para 5 of NHAI Policy Circular No. 10.2.37-2024 dated 08.07.2024
national highways authority of indiaNHAI, Regional Office, Gandhinagar20-Sep-2024
₹25.00 CrAwarded (L1)View
Empanelment of Agencies to carry out emergent works up to Rs. 50 Cr(Class-C) at the Risk and Cost of Contractor-Concessionaire in the State of Gujarat as per para 5 of NHAI Policy Circular No. 10.2.37-2024 dated 08.07.2024
national highways authority of indiaNHAI, Regional Office, Gandhinagar20-Sep-2024
Admitted-Fee/PreQual/Technical/FinanceView
L1Annual Maintenance, Incident Management and miscellaneous works on Chadotar-Palanpur Section of NH-27 (from Km. 589.600 to Km. 601.000) in the state of Gujarat.
national highways authority of indiaNHAI, Regional Office, Gandhinagar24-Sep-2024
₹1.59 Cr₹2.31 Cr-31.31%Awarded (L1)View
DQConstruction of Long Term Measures for Rectification of MoRTH Identified Blackspots at location 1) Lambha Junction at ch. 9.568, 2) Bhumel at ch. 66.150 3) Channi at ch. 108.160 on Ahmd-Vadodara Section of NH-48 in the state of Gujarat on EPC Mode.
national highways authority of indiaNHAI, Regional Office, Gandhinagar08-Feb-2025
₹65.28 Cr
Awarded: M/S SHIWALAY INFRA PROJECTS PVT LTD
View
Rectification of Blackspot by Construction of Vehicular Underpass (VUP) with Service Road at Janapur Chauraha at Km 243.330 on Beawar Pali
national highways authority of indiaNHAI RO JAIPUR18-Feb-2025
₹18.45 CrAccepted-TechnicalView
L1Routine Maintenance and Incident Management work of six lane Motachiloda to Nanachiloda Section from existing km 494.410 to existing km 509.550 of NH-48 in the State of Gujarat on Single Percentage Item Rate Basis
national highways authority of indiaNHAI Regional Office, Gandhinagar24-Feb-2025
₹2.94 Cr₹5.67 Cr-48.1%Awarded (L1)View
Installation of Metal Beam Crash Barrier in Various location of Rajamunda Barkote section of NH 143 from km 287.200 to km. 337.185 in the state of Odisha
national highways authority of indiaRajamunda Barkote03-Mar-2025
₹4.37 CrAccepted-TechnicalView
DQOperation and Maintenance of Swaroopganj Pindwara section (from Km. 264.000 to 248.700) and Pindwara Udaipur section (from Km. 0.000 to Km. 104.724) Total Length 120.024 kms.in the state of Rajasthan
national highways authority of indiaNHAI RO JAIPUR05-Mar-2025
₹35.97 CrRejected-TechnicalView
Request for Pre-Qualification of Bidders (RFQ) - 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire ro Contractor in the state of Telangana.
national highways authority of indiaTelangana18-Oct-2025
Admitted-TechnicalView
Request for Pre Qualification RFQ 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire or Contractor.
national highways authority of indiaJammu22-Oct-2025
Admitted-TechnicalView
Short Term Improvement and Routine Maintenance work of tolling reach of Mundiyar FP frm km 1184.322 to 1251.814 Length 67.492 Km on Baran Shivpuri Sec of New NH 27 in Rajasthan on PBMC Mode
national highways authority of indiaNHAI HQ25-Apr-2025
₹96.62 CrAdmitted-FinanceView
L1Repair and Maintenance works on damaged sections of 4-lane Ahmedabad-Godhra section of NH-47 from km 60.00 to km 105.00 (Length 45.0 Km) in the State of Gujarat on item rate (percentage) basis at the Risk and Cost of Contractor
national highways authority of indiaNHAI Regional Office, Gandhinagar25-Apr-2025
₹22.15 Cr₹29.18 Cr-24.09%Awarded (L1)View
L1REQUEST FOR PRE QUALIFICATION OF BIDDERS For Maintenance Works To Be Taken Up On Risk and Cost of the Concessionaire or Contractor UNDER THE JURISDICTION OF RO JAIPUR
national highways authority of indiaNHAI RO JAIPUR29-Apr-2025
Awarded (L1)View
L1Operation and Maintenance including Routine Maintenance and Incident Management of Four Laning of Ambala-Pehowa Balance Length Section of NH-152 from Km 0.000 to Km 3.700 and from Km. 46.200 to 95.360 in the State of Haryana for a Period of 1 Year
national highways authority of indiaPIU Ambala02-May-2025
₹4.74 Cr₹8.40 Cr-43.55%Awarded (L1)View
Request for Pre-Qualification (RFQ) - 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire/Contractor.
national highways authority of indiaRO Chandigarh14-Jun-2025
Admitted-TechnicalView
L1Operation and Maintenance including Routine Maintenance and Incident Management of Six Lane Panipat-Jalandhar Section of old NH-1 (New NH-44) from Km 272.000 to Km 352.730 in the State of Punjab.
national highways authority of indiaPIU Ludhiana08-Jul-2025
₹6.23 Cr₹9.43 Cr-33.99%Awarded (L1)View
Short Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 40.000 to Km 100.000 on Hyderabad to Vijayawada section of NH-65 in the state of Telangana.
national highways authority of indiaKm 40 to 100 on Hyd to Vij section of NH-6516-Jul-2025
₹37.11 CrAdmitted-Fee/PreQual/TechnicalView
DQShort Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 100.000 to Km 160.000 on Hyderabad to Vijayawada section of NH-65 in the state of Telangana.
national highways authority of indiaKm 100 to 160 on Hyd to Vij section of NH-6516-Jul-2025
₹32.90 CrRejected-TechnicalView
DQShort Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 160.000 to Km 221.500 on Hyderabad to Vijayawada section of NH-65 in the state of Telangana and Andhra Pradesh.
national highways authority of indiaKm 160 to 221.500 on Hyd to Vij section of NH-6516-Jul-2025
₹29.73 CrRejected-TechnicalView
Short Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 40.000 to Km 100.000 on Hyderabad to Vijayawada section of NH-65 in the state of Telangana.
national highways authority of indiaKm 40 to 100 on Hyd to Vij section of NH-6506-Aug-2025
₹37.11 CrAdmitted-FinanceView
L1Routine Maintenance of Parwanoo-Solan Section NH-22 New NH-05 from Km 67 000 to Km 106 139 in the State of Himachal Pradesh on item rate percentage basis
national highways authority of indiaShimla02-Sep-2025
₹9.87 Cr₹15.20 Cr-35.09%Awarded (L1)View
L1Operation and Maintenance of NH 17B from Km 0 00 Verna Junction to Km 13 100 Varunapuri Junction in the State of Goa
national highways authority of indiaGoa09-Sep-2025
₹1.94 CrAwarded (L1)View
L0Maintenance Works To Be Taken Up On Risk and Cost of the Concessionaire Contractor
national highways authority of indiaDehradun10-Sep-2025
Awarded: The Shivam Enterprises
View
DQShort-term Improvement and Routine Maintenance of 2 lane Padhi to Dahod Section from km 180.000 to km 267.000 (Design ch. 180.000 to 265.588) of NH-113 (New NH-56) in the State of Gujarat
national highways authority of indiaNHAI, Regional Office, Gandhinagar15-Nov-2025
₹3.29 CrRejected-TechnicalView
Short term Improvement with Routine Operation and Maintenance including Incident Management services on Barmer Gandhav Section of NH 68 from Km 153.000 to 259.300 (Length 106.300 Km) in the state of Rajasthan
national highways authority of indiaNHAI RO JAIPUR27-Feb-2026
₹19.99 CrAccepted-TechnicalView
L1Short term improvement and routine maintenance and safety measures of NH 17B New NH 566 from Km 0 000 Verna Jn to Km 13 100 Varunapuri Jn and Km 13 100 to Km 18 300 Loop 1 Baina Bridge top and below the bridge in the State of Goa
national highways authority of indiaGoa07-Apr-2026
₹2.76 Cr₹5.52 Cr-49.99%Awarded (L1)View
Performance based Maintenance Contract (PBMC) between Km.115.320 to 160.320 (Kheralu - Palanpur Section) on NH58 in the state of Gujarat. Job No. PBMC.58.GJ.2024-25.765
ministry of road transport and highwaysKheralu - Palanpur Section31-Jan-2025
₹41.62 CrAccepted-TechnicalView
Performance based Maintenance Contract (PBMC) between Km. 61.520 to 92.320 (Vadali-Satlasana Section) on NH58 in the state of Gujarat. Job No. PBMC.58.GJ.2024-25.770
ministry of road transport and highwaysVadali-Satlasana Section31-Jan-2025
₹29.53 CrAccepted-TechnicalView

Frequently Asked Questions

How many government tenders has A S PATEL participated in?

According to public e-procurement data records, A S PATEL has participated in 67 government infrastructure and procurement tenders across central and state authorities.

How many tenders has A S PATEL won as lowest bidder (L1)?

A S PATEL has secured 22 tenders as the official lowest bidder (L1) or awardee, achieving an overall win rate of 32.8%.

What is the total value of government contracts awarded to A S PATEL?

The cumulative value of project contracts awarded to A S PATEL is approximately ₹189.40 Cr, across agencies such as ministry of road transport and highways, national highways authority of india.

Explore more public procurement intelligence and infrastructure data: