The Bihar State Road Development Corporation Limited (BSRDCL) has invited Request for Proposal (RFP) for consultancy services to prepare the feasibility report for two ambitious Ganga Path road projects aimed at boosting regional connectivity along the Ganga river.
Under Phase 1, the proposed 4-lane elevated/at-grade corridor will connect Ghorghat–Sultanganj–Bhagalpur–Sabour over a length of 53.10 km. Phase 2 will stretch 54.60 km, linking Suryagarha–Munger–Bariyarpur–Ghorghat. The consultancy contract period is set for one month.
The RFP was issued on July 9, 2025, with documents available for download until July 15 (5 PM). The last date for online submission is July 16, while financial proposals will be opened on July 17 at 3:30 PM.