SiwanBRPNNLUnknown
Construction of HL RCC Bridge with Utility Shifting and Protection work in the main Road near parisadan Siwan in left out portion of N.H-85 in Siwan District.
Saran Works·Siwan·Bihar
Admin Approval
₹774 L
Agreement Amount
₹4.69 Cr
Commencement
19 Sep 2020
Scheduled Completion
18 Mar 2022
Project Details
DivisionSaran Works
DistrictSiwan
SchemePlan
AA Vide No.2490 (S)
AA Date28 Apr 2020
Bridge Type/LengthN/A
Cost & Timeline
Admin. Approval₹774.00 lakh
Agreement Amount₹4.69 Cr
Commencement19 Sep 2020
Scheduled18 Mar 2022
Revised02 Dec 2022
Schedule StatusOn schedule
Construction of HL RCC Bridge with Utility Shifting and Protection work in the main Road near parisadan Siwan in left out portion of N.H-85 in Siwan District. is a bridge construction project in Siwan district under the Bihar Rajya Pul Nirman Nigam Limited (BRPNNL), Saran Works. The agreement amount is ₹4.69 Cr, and the project is currently Unknown.
BRPNNL bridges improve rural and inter-district connectivity across Bihar. Other bridge projects in Siwan district are listed below.
Remarks
Work Completed.
?
Frequently Asked Questions
- QWhat is the current status of "Construction of HL RCC Bridge with Utility Shifting and Protection work in the m"?
- Status: Unknown. Physical achievement: N/A. On schedule. Scheduled completion: 18 Mar 2022. Revised date: 02 Dec 2022. This is a BRPNNL bridge and road project in Siwan, Bihar.
- QWhat is the cost of this BRPNNL project?
- The agreement amount for this project is ₹4.69 Cr. Administrative approval: ₹774.00 lakh. The project is in Saran Works division, Siwan district.
- QWhich division is this BRPNNL project in?
- This project is under BRPNNL (Bihar Rajya Pul Nirman Nigam Ltd) Saran Works division in Siwan district, Bihar. Scheme: Plan. AA Vide No.: 2490 (S).
- QWhat does BRPNNL do in Bihar?
- BRPNNL (Bihar Rajya Pul Nirman Nigam Ltd) is a Bihar government corporation responsible for bridge and road construction across rural and semi-urban Bihar. "Construction of HL RCC Bridge with Utility Shifting and Prot" in Siwan is one of many bridge projects tracked through the Monthly Progress Report (MPR) system monitored on BiharInfraTales.